Packages and inspection plans
Packages start with a trade-specific stage sequence and linked checklists, then adapt to the project specification. An unrecognised package name still lands with a generic sequence — a package is never created empty.
- Work packages with seeded inspection stages
- Four gate types: hold point, trade handover, standard, milestone
- Zone-by-stage inspection matrix
- Checklists with acceptance criteria
- Evidence requirements on checklist items