Field

Control package readiness, inspection and evidence from pre-start through completion.

Every work package carries its inspection stages, its zone-by-stage matrix and its checklists. The controls that matter — hold points, sign-offs, open failures — sit on the record, not in a separate tracker.

Watch it run

One fire cavity barrier, specification to closed record.

A single inspection followed the whole way: the specification clause becomes a checklist, the checklist meets the drawing and the zone matrix, the subcontractor works it at the slab edge, the main contractor rejects it, and it closes on the second pass with the sign-off event history intact.

Play the walkthrough1:31
0:03 / 1:311. Opener

Who works here

Quality manager

Needs to know which stages are closed, which are stuck at a hold point and which failures are still open — across every package.

The matrix answers it per zone, without chasing spreadsheets.

Package manager

Runs the subcontractor day to day and needs pre-start requirements, ITP and RAMS review in one place.

Package readiness and review sit on the package itself.

Site supervisor

Signs off work at the workface and needs the checklist, acceptance criteria and evidence requirements in hand.

The checklist item says what good looks like and what to photograph.

Packages and inspection plans

Packages start with a trade-specific stage sequence and linked checklists, then adapt to the project specification. An unrecognised package name still lands with a generic sequence — a package is never created empty.

  • Work packages with seeded inspection stages
  • Four gate types: hold point, trade handover, standard, milestone
  • Zone-by-stage inspection matrix
  • Checklists with acceptance criteria
  • Evidence requirements on checklist items

ITP and RAMS as controlled documents

The two documents a main contractor reviews before a subcontractor starts get a document-control workflow rather than an inbox — including supersede, so a newer revision replaces its predecessor rather than sitting beside it.

  • Six-state review workflow with submitter and reviewer signatures
  • AI pre-review reporting good practice as well as deficiencies

Controls on site

Hold points and trade handovers gate stage completion until the required sign-off is present, and an unreleased hold point stops the next stage in that area from starting. The incoming trade cannot start on an area that has not been handed over.

  • Hold points with witnessed release
  • NCRs raised against packages and locations
  • Permits to work
  • Trade handovers with sign and witness
  • Site safety reporting from a QR poster — no account needed, anonymous if the reporter chooses, accepted by the safety team into the Tasks register

On site, on a phone

Supervisors and subcontractors work in the phone’s browser. Walk the job with the drawing open, drop a pin where the defect is, take the photo and mark it up before the snag is saved.

  • Snag walk: pin on the drawing first, then describe
  • Camera or library, with photo markup that keeps the original
  • Tasks open on “Needs me” — where it is your move
  • Checklists, review and trade handover signing on the phone
  • Package RAMS, ITPs and test records to hand, read-only

Subcontractors inside the project

Each subcontractor gets external access that sees and works only their own packages — they never join your organisation. They carry out their checks; you countersign, verify and close.

  • Subcontractors sign their work available for inspection
  • Choose what share of each stage you countersign — hold points and trade handovers always 100%
  • Snags completed with a photo by the subcontractor, closed by you
  • Read-only access for building control, limited to one project

Daily running of the job

Site logs, tasks and photo evidence keep the day-to-day record beside the packages it relates to.

  • Site logs with weather capture
  • Snags, NCRs, builders’ work requests and trade handovers in one Tasks register
  • Photo evidence pinned to plans

An inspection, end to end

  1. 01

    Plan

    Assigning zones creates the matrix cells; opening one creates the inspection against the right stage and checklist.

  2. 02

    Inspect

    The subcontractor works the checklist, attaches evidence and signs the result as available for inspection.

  3. 03

    Review

    The main contractor reviews, marks failed items and signs off — or rejects with the failures assigned for rework.

  4. 04

    Close

    Rework is re-attested and the record closes with the full sign-off event history preserved.

An unreleased hold point stops later stages of the same package in that area from being started or submitted; it does not hold up other areas or other packages.

The phone screens run in the phone’s browser. There is no separate app to install.

See how BuildAssure would structure one of your live work packages.

Bring a package name, an ITP or a project specification. We will show how BuildAssure turns it into a controlled project workflow.